When approached by a partner to supply a cabling system, Smart suggested a meeting with the client to agree with the specification and time scales. As a result of this initial session, the brief changed enormously.

As well as the structured cabling and specification being modified to meet current standards, the work undertaken increased to include the removal of the old floor coverings and replacing with new, constructing new walls, bespoke joinery, designer wall coverings and the transformation of the meeting room facilities.

The addition of a 65” 4K display in the training room gave the environment a real “wow” factor, with an ecstatic client.