Contact Us

Tel: 0345 3 822 833

© Smartplc.com 2019

  • Black LinkedIn Icon
  • Facebook
  • Twitter
  • Instagram

Abbey Tax Office Fit Out 

Smart received a call from Abbey’s IT manager. “you have been highly recommended, when can you come and look at a fibre link”. With Telco quoting 90 days to install a service, Smart was able to provide an inter-building fibre link giving increase bandwidth and delivered within 7 days.

This initial piece of work lead to the install of a new CAT6A data network as well as carrying out an Electrical Condition Report and to identify any items that did not meet current standards. Smart chose the Excel Cat6A solution with its 25 year warranty and the installation was completed on time and within budget.